- 45,000 m³Concrete in 1 year
- 5,000 tonsSteel
For the prestigious office project The Wings in Diegem, GSS supplied complete edge formwork with integrated fall protection. One system, one action, one worker who can immediately and safely continue to the next floor.
In a single year, 45,000 m³ of concrete was poured and 5,000,000 kg of steel processed here. Such a pace is only possible with an edge solution that installs quickly, is reusable and guarantees safety on site from the first metre.